Standing up a 30-person shift typically takes 2–4 weeks. Here are the five steps of a launch and what you can prepare to keep it on track.
When a new contract, a newly outsourced logistics process or a persistent labour shortage means you need a whole shift, the first question is always how long it will take. The short answer: launching a 30-person team typically takes 2–4 weeks. Where you land in that range depends mainly on three things: headcount, the skills required and the location.
Below we walk through how a launch is built, and what speeds up or slows down each step. The same process is summarised on our How we work page.
What drives the timeline
- Headcount. Thirty people at once is a different job from five. Larger numbers call for volume recruitment and several rounds of training.
- Skills. Warehouse staff for straightforward goods handling are quicker to find and train than people for roles that need a specific licence or prior experience.
- Location. A site that is easy to reach, with a local labour pool, shortens the process. If housing and travel have to be arranged, more preparation is needed.
- Shift pattern. Filling a single day shift is simpler than covering several shifts around the clock.
These factors are worth going through at the very first meeting, because they determine a realistic start date.
The five steps of a launch
1. Needs assessment
We start with a site visit. We look at the tasks, volumes and peaks, the shift pattern and the health and safety rules. From this we draw up the staffing plan, the list of required skills and the training plan. The more thorough this step, the fewer surprises later.
2. Recruitment and pre-screening
Recruitment starts from the assessment. Pre-screening checks whether a candidate suits the specific work and genuinely accepts the shift pattern. This stage also covers the pre-employment medical and, where needed, arranging housing and travel. We line up reserve candidates at this point too.
3. Training
Training is built around the actual task, not general principles. Alongside the safety induction, we cover on-site processes, the use of equipment and the quality expectations. In mixed Hungarian and Asian teams, an interpreter and a cultural mentor help people settle in.
4. On-site coordination
From the first shift, an on-site coordinator is responsible for the rota, attendance and day-to-day communication with your shift leader. They are the first point of contact when something is not going as it should. Your shift leader can then focus on production rather than on rotas and absences.
5. Reporting and replacement
We report on operations regularly: coverage, attendance and any issues that have come up. If someone drops out or does not work out, we arrange the replacement, so the shift is not left short.
What you can prepare
How fast a launch goes depends partly on the client. It helps a great deal if the following are ready for the first meeting:
- a description of the tasks, expected volumes and peak periods
- the planned shift pattern and start date
- a named contact who can make decisions
- site safety rules and access procedures
- existing training materials, or a key person who can take part in training
- clarity on who provides work equipment and PPE
- the quality expectations and how they will be measured
Often it is not recruitment that slows a launch down but a detail settled too late: a missing site pass, an unclear shift pattern or a training plan that nobody owns. Settling these in the first week saves more time than any attempt to speed things up later.